Scope and field context
Project scope and field context
ATI Companies conducted installation of Cement Coring, Monitoring Wells and Injection Wells services to remediate a deep and intermediate plume at the City of Orlando Soccer Stadium Site in Orange County, Florida. ATI used multiple drilling methods that included Direct-Push Technology (DPT) and Hollow Stem Augers. Installation of 45 Monitoring Wells, at depths of 25 – 45 feet, including pads, grouting, and completion of all bollards, manholes and metal stick-up covers. Wells were constructed with 1.25-inch diameter PVC riser with ten feet of 6-slot (30/65) prepack screen. A GEOPROBE 7700 was used for the coring and the drilling with Hollow Stem Augers (HSA’s). Monitoring Well Installations, Abandonments and Replacements were also performed throughout the project. ATI Companies conducted installation of Cement Coring, Monitoring Wells and Injection Wells services to remediate a deep and intermediate plume at the City of Orlando Soccer Stadium Site in Orange County, Florida. ATI used multiple drilling methods that included Direct-Push Technology (DPT) and Hollow Stem Augers. Installation of 45 Monitoring Wells, at depths of 25 – 45 feet, including pads, grouting, and completion of all bollards, manholes and metal stick-up covers. Wells were constructed with 1.25-inch diameter PVC riser with ten feet of 6-slot (30/65) prepack screen. A GEOPROBE 7700 was used for the coring and the drilling with Hollow Stem Augers (HSA’s). Monitoring Well Installations, Abandonments and Replacements were also performed throughout the project. Project Services: Installed 45 Monitoring Wells at depths between 25-45 feet Installed 12 MW - 259-ft total DPT Soil Sampling to 45-ft Re-core 14 previously installed boreholes Groundwater monitoring well installation included SCH 40 PVC casings, at depths up to 45 feet Installed 6 MW -136-ft total DPT Soil Sampling to 45-ft 2-Concrete Core Cuts All injection wells were constructed with 4-inch diameter SCH40 PVC casings, at depths up to 15 feet Well Completion - Includes Development, Manhole Covers, Pads & Locking Caps